LOBE PUMPS
Maintenance and repair
maintenance of the lobe pump, without the workshop due to compact design, can be made with ease and in a very short time in the field.
Separation of the electrical connection on the pump motor is required before the pump maintenance. After this process is done, pump maintenance and repair can be done.
* Maintenance and changing of Lobes, the coupling between the pump and engine and the pump with line connections can be made with the bolts without removing the front cover removed.
* In this section, The lobes that are easily removed, cleaning and maintenance can be performed.
* The front body to change the seal needs to be removed. Body also reveling operation can be performed in a simple way.
* The threaded portion of the oil reservoir drain oil at periodic intervals is replaced by the plug opening. In this way, the threaded life will be monitored for increase
* The necessary cleaning is done after they are removed all the parts
way back again onto the body and the pump assembled is activated. The direction of rotation of the motor when commissioning the pump according to electrical connections must be made.
FOLLOW US ON FACEBOOK!
Be fan of our official Facebook fan page and development of the first to get your news!
Contents of Professional Service Package:
- Plate supply for every brand and model.
- Gasket supply for every brand and model.
- Revision and cleaning of plate heat exchanger.
- Fast and detailed cleaning of heat exchanger plates.
- Cleaning heat exchanger plates with special chemicals.
- Production and supply of every type of nut and pin.
- Delivery of heat exchanger operating like it is new.
- 7 days 24 hours service opportunity.